Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home4/somaccon/public_html/wp-includes/functions.php on line 6131

Warning: Cannot modify header information - headers already sent by (output started at /home4/somaccon/public_html/wp-includes/functions.php:6131) in /home4/somaccon/public_html/wp-content/plugins/wp-fastest-cache/inc/cache.php on line 428
Industrial / Oil&Gas / Petrochemical – SOMAC CONTRACTING CO. https://somaccontractingco.com Sat, 02 Apr 2022 14:39:18 +0000 en-US hourly 1 https://wordpress.org/?v=6.1.1 JUBAIL CAUSEWAY BRIDGES https://somaccontractingco.com/portfolio-items/jubail-causeway-bridges/ https://somaccontractingco.com/portfolio-items/jubail-causeway-bridges/#respond Tue, 25 May 2021 03:01:24 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=510 SOMAC’s work on this most prominent project consisted of the procurement and construction of three large bridges (two over 425m in length and one over 140m), some as prestressed box girders and some as precast post tensioned beams. Deep piles for abutments and huge retaining walls 12m in height with associated buttresses were built. Said bridges had to pass over high pressure hydrogen sulfide gas pipelines and overpassed two seawater canals 60m wide, a case which posed a big challenge in construction. Super elevated box girders 2.4m high and 17m wide with free spans up to 60m in length were built. The bridges received three sequences of post tensioning. Over 150 precast post-tensioned beams up to 38m in length and 90 tons in weight each had to be installed under very adverse conditions, location- and schedule-wise. SOMAC prestressing engineers and teams carried over six hundred prestressing operations implementing the design criteria with high accuracy and superlative professionalism. SOMAC dealt with the three world authorities on bridges: T.Y.Lin, VSL Losinger, and James Libby (California, USA) and delivered the challenging project ahead of schedule.

]]>
https://somaccontractingco.com/portfolio-items/jubail-causeway-bridges/feed/ 0
INTERNATIONAL COMMERCIAL COMPLEX https://somaccontractingco.com/portfolio-items/international-commercial-complex/ https://somaccontractingco.com/portfolio-items/international-commercial-complex/#respond Tue, 25 May 2021 02:05:39 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=519 SOMAC’s work consisted of the procurement and construction of about 1,200 commercial units with all associated works from A to Z. This included, among others, electrical substations, 350kms of high and medium voltage cable installations, telecommunications, drainage networks, fire fighting networks, kiosks, batteries of rest rooms and transformers (power capacity 14 MW), parking areas and streets, gigantic decorative arches of precast concrete. Given the challenge of the project in its magnitude and tight schedule, SOMAC established a precast factory, a steel shop factory and a carpentry shop. This allowed SOMAC to complete the project ahead of expected timelines and with the highest level of quality.

]]>
https://somaccontractingco.com/portfolio-items/international-commercial-complex/feed/ 0
GULF MARKET (AL-HAYAT PLAZA) https://somaccontractingco.com/portfolio-items/gulf-market-al-hayat-plaza/ https://somaccontractingco.com/portfolio-items/gulf-market-al-hayat-plaza/#respond Tue, 25 May 2021 01:06:55 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=528

One of the biggest projects of its kind in the Kingdom at the time, this project occupies an area of 150,000 square meters of commercial space, including 1,560 commercial units and a great mosque.

SOMAC’s work consisted of the procurement and construction of a Gulf Market occupying an area of 150,000 square meters, including 1,560 commercial units, 6 main kiosks, a great mosque, 17 power rooms with a total capacity of 18 million watts, 12 telecommunication rooms, 1,500 car parks, thousands of precast decorative arches of 10 meters in width, a fire fighting system, a drainage system, 36,000 square meters of covered and air-conditioned streets, side walks, water fountains and play grounds etc.

Thanks to SOMAC’s expertise and efficient working practices, we were able to deliver this project in 17 months, five months ahead of schedule.

]]>
https://somaccontractingco.com/portfolio-items/gulf-market-al-hayat-plaza/feed/ 0
RASTANURA REFINERY UPGRADE https://somaccontractingco.com/portfolio-items/rastanura-refinery-upgrade/ https://somaccontractingco.com/portfolio-items/rastanura-refinery-upgrade/#respond Mon, 24 May 2021 12:11:38 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=540

Major upgrade under conditions of a live refinery to one of the oldest refineries in the region.

This prominent project was distinguished in that it had to be completed under conditions of a live refinery, which required absolute levels of safety, quality control and progress under very ominous and adverse conditions. Sub-soil strata were full of live pipes, cables, utilities etc. and likewise above ground.

SOMAC’s work on this prominent project consisted of the procurement and construction of civil and building works including, among others, the construction of Process Interface Buildings, electrical substations, pumps, manholes, valve boxes, neutralization tanks, high lift pump house, travelling screen, cofferdam, equipment and pipe rack foundations, pile caps, pipe sleepers, structural steel, site paving and bridges with supply of related steel, electrical, instrumentation and sanitary systems.

]]>
https://somaccontractingco.com/portfolio-items/rastanura-refinery-upgrade/feed/ 0
KHANNAK & MALLOULI BRIDGES https://somaccontractingco.com/portfolio-items/khannak-mallouli-bridges/ https://somaccontractingco.com/portfolio-items/khannak-mallouli-bridges/#respond Mon, 24 May 2021 12:10:23 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=547 SOMAC’s work consisted of the procurement and construction of two bridges, the Khannak bridge (290m length) and the Mallouli bridge (400m length), in Tripoli, Lebanon. Works covered all related construction works including foundations, piers, abutments and retaining walls, etc.

]]>
https://somaccontractingco.com/portfolio-items/khannak-mallouli-bridges/feed/ 0
AIMAN IRRIGATION SYSTEM https://somaccontractingco.com/portfolio-items/aiman-irrigation-system/ https://somaccontractingco.com/portfolio-items/aiman-irrigation-system/#respond Sun, 23 May 2021 12:16:01 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=553 SOMAC’s work consisted of the procurement and installation of a general irrigation system in the Aiman area in Egypt, including large distance pressure pipes (over 13km of pressure pipes 1,200MM – 300MM), pump stations, pumps (1,900 cubic meters / hour) and all associated civil works.

]]>
https://somaccontractingco.com/portfolio-items/aiman-irrigation-system/feed/ 0
AL-KUFRA WATER NETWORK https://somaccontractingco.com/portfolio-items/al-kufra-water-network/ https://somaccontractingco.com/portfolio-items/al-kufra-water-network/#respond Sat, 22 May 2021 12:17:59 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=567 SOMAC’s work consisted of the procurement and construction of a water network in Al-Kufra proving in Libya, along with 100 housing units and ancillary works.

]]>
https://somaccontractingco.com/portfolio-items/al-kufra-water-network/feed/ 0
UTILITY BRIDGE AND CULVERTS https://somaccontractingco.com/portfolio-items/utility-bridge-and-culverts/ https://somaccontractingco.com/portfolio-items/utility-bridge-and-culverts/#respond Fri, 21 May 2021 12:19:39 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=576 SOMAC’s work consisted of the procurement and construction of an extension to an existing utility bridge, including culverts.

]]>
https://somaccontractingco.com/portfolio-items/utility-bridge-and-culverts/feed/ 0
TRADING & OFFICES CENTER https://somaccontractingco.com/portfolio-items/trading-offices-center/ https://somaccontractingco.com/portfolio-items/trading-offices-center/#respond Thu, 20 May 2021 12:21:22 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=581 SOMAC’s work consisted of the procurement and construction of a Trading & Offices Center for the Botswana Development Corporation (Botswana, Southern Africa). Scope covered all related civil and construction works end-to-end.

]]>
https://somaccontractingco.com/portfolio-items/trading-offices-center/feed/ 0
STEEL MILL https://somaccontractingco.com/portfolio-items/steel-mill/ https://somaccontractingco.com/portfolio-items/steel-mill/#respond Wed, 19 May 2021 12:23:16 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=585 SOMAC’s work consisted of the procurement and construction of the steel bar factory’s expansion, electrical control room and underground water treatment plant. Scope covered all related civil works, including, among others, site preparation, pile capping, raft foundation, mill foundation, pipe sleepers and all related structural works.

]]>
https://somaccontractingco.com/portfolio-items/steel-mill/feed/ 0