Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home4/somaccon/public_html/wp-includes/functions.php on line 6131

Warning: Cannot modify header information - headers already sent by (output started at /home4/somaccon/public_html/wp-includes/functions.php:6131) in /home4/somaccon/public_html/wp-content/plugins/wp-fastest-cache/inc/cache.php on line 428
Home – SOMAC CONTRACTING CO. https://somaccontractingco.com Sat, 02 Apr 2022 14:46:45 +0000 en-US hourly 1 https://wordpress.org/?v=6.1.1 JUBAIL CAUSEWAY BRIDGES https://somaccontractingco.com/portfolio-items/jubail-causeway-bridges/ https://somaccontractingco.com/portfolio-items/jubail-causeway-bridges/#respond Tue, 25 May 2021 03:01:24 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=510 SOMAC’s work on this most prominent project consisted of the procurement and construction of three large bridges (two over 425m in length and one over 140m), some as prestressed box girders and some as precast post tensioned beams. Deep piles for abutments and huge retaining walls 12m in height with associated buttresses were built. Said bridges had to pass over high pressure hydrogen sulfide gas pipelines and overpassed two seawater canals 60m wide, a case which posed a big challenge in construction. Super elevated box girders 2.4m high and 17m wide with free spans up to 60m in length were built. The bridges received three sequences of post tensioning. Over 150 precast post-tensioned beams up to 38m in length and 90 tons in weight each had to be installed under very adverse conditions, location- and schedule-wise. SOMAC prestressing engineers and teams carried over six hundred prestressing operations implementing the design criteria with high accuracy and superlative professionalism. SOMAC dealt with the three world authorities on bridges: T.Y.Lin, VSL Losinger, and James Libby (California, USA) and delivered the challenging project ahead of schedule.

]]>
https://somaccontractingco.com/portfolio-items/jubail-causeway-bridges/feed/ 0
AIMAN IRRIGATION SYSTEM https://somaccontractingco.com/portfolio-items/aiman-irrigation-system/ https://somaccontractingco.com/portfolio-items/aiman-irrigation-system/#respond Sun, 23 May 2021 12:16:01 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=553 SOMAC’s work consisted of the procurement and installation of a general irrigation system in the Aiman area in Egypt, including large distance pressure pipes (over 13km of pressure pipes 1,200MM – 300MM), pump stations, pumps (1,900 cubic meters / hour) and all associated civil works.

]]>
https://somaccontractingco.com/portfolio-items/aiman-irrigation-system/feed/ 0
AL-KUFRA WATER NETWORK https://somaccontractingco.com/portfolio-items/al-kufra-water-network/ https://somaccontractingco.com/portfolio-items/al-kufra-water-network/#respond Sat, 22 May 2021 12:17:59 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=567 SOMAC’s work consisted of the procurement and construction of a water network in Al-Kufra proving in Libya, along with 100 housing units and ancillary works.

]]>
https://somaccontractingco.com/portfolio-items/al-kufra-water-network/feed/ 0
BRIDGES AND UNDERPASSES https://somaccontractingco.com/portfolio-items/bridges-and-underpasses/ https://somaccontractingco.com/portfolio-items/bridges-and-underpasses/#respond Tue, 18 May 2021 12:27:03 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=592

Bridges and underpasses at intersections on King Khaled street, King Abdulaziz street, King Fahd street and 42 street.

SOMAC’s work consisted of the procurement and construction of 3 bridges and 3 underpasses on King Khaled street, King Abdulaziz street, King Fahd street and 42 street. Scope covered all related construction works including, among others, site preparation, piling, foundations, piers, pier cap with formliners, abutments and retaining walls (up to 13m in height), precast girders (up to 18m long) including post-tensioning and grouting, cantilevers up to 4.25m each, precast barriers, expansion joints and elastomeric bearing pads, pot bearing pads, pump rooms, etc.

]]>
https://somaccontractingco.com/portfolio-items/bridges-and-underpasses/feed/ 0
PETRORABIGH MONOMER UNIT https://somaccontractingco.com/portfolio-items/petrorabigh-monomer-unit/ https://somaccontractingco.com/portfolio-items/petrorabigh-monomer-unit/#respond Sun, 16 May 2021 12:20:45 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=543

PetroRabigh, a joint venture between Saudi Aramco and Sumitomo Chemical, is a major petrochemical complex producing about 15MM tons of refined products and 5MM tons of petrochemical products per year.

SOMAC’s work on this distinguished project consisted of the procurement and construction of the PC2 Monomer Unit (monoethylene glycol and propylene oxide). Works covered all related civil, structural and architectural works including, among others, foundations (tank foundations, heavy reactor foundations, equipment foundations), waterlines (cooling, fire, drinking water, sewer), deep pits and structures (including the EO reactor, EO stripper, EC reactor, CO2 absorber, and MEG purification and air fin), construction of the Process Interface Buildings and Substation Buildings in both MEG and PO units with all necessary works (concrete, masonry, metals, wood and plastics, thermal and moisture protection, plumbing, sanitary, HVAC and electrical works, sewer and drainage works, doors and windows, finishing, specialty items, etc.), pipe racks and pipe tracks, pipe trenches, manholes, drainage U-ditches, asphalt roads, concrete paving and heavy haul roads including temporary bridge over pipeline

]]>
https://somaccontractingco.com/portfolio-items/petrorabigh-monomer-unit/feed/ 0
SAUDI KAYAN PETCHEM COMPLEX https://somaccontractingco.com/portfolio-items/saudi-kayan-petchem-complex/ https://somaccontractingco.com/portfolio-items/saudi-kayan-petchem-complex/#respond Fri, 14 May 2021 12:23:26 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=541

Saudi Kayan is one of the largest petrochemical projects in the world, located in Jubail.

SOMAC was among a distinguished number of contractors selected to support the project. SOMAC performed various construction works spanning from earth and geotechnical works to foundational, structural and other civil works in the Utilities & Offsites scope which comprised about 30% of the total project. Works included, among others, excavation, demolition mud mat, forms, rebars, concreting, curing, waterproofing, protection, backfilling, grading for pipe racks and sleepers, etc.

]]>
https://somaccontractingco.com/portfolio-items/saudi-kayan-petchem-complex/feed/ 0
FANATEER SEA CLUB https://somaccontractingco.com/portfolio-items/fanateer-sea-club/ https://somaccontractingco.com/portfolio-items/fanateer-sea-club/#respond Thu, 13 May 2021 12:09:05 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=499

Construction of a Sea Club in Al Fanateer Marina Development in Jubail (in association with OSG).

SOMAC’s work included the furnishing of all plant, labor, supervision, tools and equipment, technical and professional services, materials, supplies and articles necessary for the construction of new Sea Club buildings located within the Al Fanateer Marina Development in Jubail. The expansion work comprised a diving & water sport club, a youth club, a bowling club, an indoor swimming pool, indoor multi-purpose courts, a mosque and an amenities building.

]]>
https://somaccontractingco.com/portfolio-items/fanateer-sea-club/feed/ 0
THE PEARL, QATAR https://somaccontractingco.com/portfolio-items/the-pearl-qatar/ https://somaccontractingco.com/portfolio-items/the-pearl-qatar/#respond Wed, 12 May 2021 12:04:20 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=498

The Pearl is an artificial island spanning nearly 4 square kilometers in Doha, Qatar.

SOMAC’s work consisted of the procurement and construction of civil and utilities infrastructure works. Specific works included,among others, the following:
▪ Procurement and construction of 12 box-type culverts located in the Pearl Island
▪ Procurement and Construction of all civil structural works for the District Cooling Plant building, transformer room building and the Administration building. The works included huge raft foundations (approximate concrete quantity of 15,000 cubic meters), retaining walls, underground trenches, floor slabs (around 8,000 square meters), columns with brackets up to 29 meters in height, and floor screeding and concrete walls for the lift head room
▪ Procurement and construction of two buildings of the pneumatic sold waste treatment plant (Collection Station A & B) including raft foundations, retaining walls, suspended slab, roof slab, architectural works and landscaping
▪ Procurement and construction of all civil works for a Sewage Treatment Plant including under and above ground tanks, plinths, electrical control building, glass reinforced pipes for transmission line, valve chambers, landscaping and fencing

]]>
https://somaccontractingco.com/portfolio-items/the-pearl-qatar/feed/ 0
NORTH SOUTH RAILWAY (NSR) https://somaccontractingco.com/portfolio-items/north-south-railway-nsr/ https://somaccontractingco.com/portfolio-items/north-south-railway-nsr/#respond Sun, 09 May 2021 01:41:52 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=875 North South Railway (NSR) is a major railway expansion in Saudi Arabia consisting of over 2,400km of railway.

SOMAC’s work consisted of the procurement and construction of 3 UR bridges, 22 underpasses, 407 box culverts (single and multicell), 174 pipe culverts, 12 number camel crossings and 5 road crossings distributed over 700 km of desert roads in Al-Jouf Area. Concrete quantities of over 140,000 cubic meters were poured in this project and 4,800 linear meters of pipe culverts were installed. Protective coatings and joint sealants were applied across all the structures. The works for this distinguished project also included all earthworks necessary.

]]>
https://somaccontractingco.com/portfolio-items/north-south-railway-nsr/feed/ 0
HARAMAIN HIGHSPEED RAILWAY https://somaccontractingco.com/portfolio-items/haramain-highspeed-railway/ https://somaccontractingco.com/portfolio-items/haramain-highspeed-railway/#respond Fri, 07 May 2021 12:10:13 +0000 http://dev4.ewsdev.in/?post_type=avada_portfolio&p=11

The Haramain Highspeed Railway links the two Holy Mosques through Jeddah, King Abdulaziz International Airport, and King Abdullah Economy City along a 450km route.

SOMAC’s work consisted of the procurement and construction of 9 different types of bridges (rail bridges, road bridges and Wadi bridges) with different types of construction including cast-in-place post-tensioned box girders, precast post-tensioned omega girders, and precast post-tensioned I-beams.

Work activities included, among others, structural excavation, backfilling, foundations, piers and girders, post-tensioning, installation of bearing pads and expansion joints, fixing of water bars, treatment of construction joints, waterproofing, dewatering, grouting, protective coatings, and joint sealant.

The work used over 80,000 cubic meters of concrete, 18,000 tons of reinforcement steel, 2,000 tons of post-tensioning steel, and 1,000 bearing pads.

]]>